Gallery

Hotel Blanes

This was a total remodelling of the building, in which a total of 147 doors and windows were changed.

Project details

    Aim :
  • Achieving the maximum thermal isolation for saving energy (1,1 Ug) and soundproofing (39 Db), as the hotel is located in the playful centre in Blanes.
  • Used materials :
  • PVC with 5 interior, glasses with “Silence” treatment camera 6/16 Argon gas/8 and perimeter hinges perfectly closed.
  • Other project features :
  • There are some sensors which deactivate the air conditioning when the balcony is open.
  • A luxurious detached house
  • Hotel Blanes
  • A children school
  • A majestic house